Based on the December 1996 sampling results, the Department conducted a Prompt Interim Response at the Naginey Site in July of 1998. The response addressed 180 drums of foundry casting sands and 1,600 tons of battery casings/soils. The Prompt Interim Response was conducted to remove the direct contact threat that existed at the site.